Keyphrases
Wastewater Treatment Plant
100%
Control Strategy
71%
Controller
67%
Control System
50%
Robust Tuning
46%
Two-degree-of-freedom
39%
Control Process
38%
Servo
37%
Tuning Rules
37%
Artificial Neural Network
34%
Effluent
33%
Proportional-integral-derivative Controller
32%
Benchmark Model
32%
PID Controller
28%
Internal Model Control
25%
Operating Cost
25%
PID Tuning
24%
Neural Network
23%
PI Controller
23%
Dissolved Oxygen
22%
Two-degree-of-freedom Controller
22%
Effluent Quality
22%
Plant Control
21%
Proportional Integral Derivative
20%
Controller Design
19%
Tuning Methods
19%
Robust Stability
18%
Load Disturbance
18%
Proportional Integral Controller
17%
Performance Robustness
17%
Design Methodology
17%
Maximum Sensitivity
16%
Closed-loop Control System
16%
Wastewater Treatment Plant Operation
16%
Control Loop
15%
Activated Sludge Process
15%
Control Design
15%
PI-PID Controller
15%
Control Approach
15%
Proportional-integral-derivative Tuning
14%
PID Control
14%
2DOF
14%
Fuzzy Controller
14%
Regulatory Control
14%
Control Actions
13%
Servo Control
13%
Control Method
13%
Controller Tuning
13%
First Order Plus Dead Time (FOPDT)
13%
Control Scheme
13%
Engineering
Wastewater Treatment Plant
86%
Control Strategy
71%
Control Systems
68%
Two Degree of Freedom
58%
Servomotors
39%
Dead Time
38%
Set Point
34%
Closed Loop
32%
Internal Model Control
31%
Derivative Controller
27%
Reference Model
27%
Artificial Neural Network
25%
Controller Tuning
24%
Internals
21%
Robust Stability
20%
Systems Performance
20%
Controller Design
18%
Integral Controller
18%
Simulation Model
18%
Proportional-Integral-Derivative Control
16%
Energy Engineering
15%
Operational Cost
15%
Control Design
15%
Control Action
15%
Plant Operation
14%
Feedback Control Systems
14%
Control Scheme
13%
Greenhouse Gas
13%
Max
13%
Regulatory Control
13%
Servo Control
13%
Fractional-Order
12%
Performance Degradation
12%
Flow Rate
12%
Flow Velocity
12%
Control Loop
12%
Optimisation Procedure
11%
Matching Model
11%
Design Procedure
11%
Degree of Freedom
11%
Design Method
11%
Simulation Example
10%
Operation Mode
10%
Activated Sludge Process
10%
Performance Analysis
10%
Controller Parameter
10%
Delay Time
9%
Inventory Control
9%
Transfer Learning
9%
Multiobjective Optimization
9%